TWDB No. 62928 / JM No. 18552
City of Rising Star – TWDB Water Line Replacement
Project Description
PROJECT INCLUDES: Replacement of a portion of the Owner's existing water distribution system with new 6" PVC Main Water Line, re-connections, service reconnections, etc.
ESTIMATED COST: Base Bid A = $120,000
Base Bid A, Alternate #1 = $165,000
Base Bid B = $180,000
Base Bid C = $180,000
Base Bid D = $260,000
BID BOND: 5 %
PERFORMANCE/PAYMENT BONDS: 100 %
FUNDING AGENCY: Texas Water Development Board (TWDB) / TWDB No. 62928
Contractors: Please note that we have a new feature on our website. Questions should now be entered online, in the box provided for each project prior to the question deadline. To avoid duplicating questions, please review the previously submitted questions posted at the bottom of each project’s web page.
Questions will be automatically directed to and reviewed by the project manager. All project specific questions posted here will be answered via addendum and distributed to all plan holders. Addenda will also be posted to the website and may be accessed by clicking the red “Addendums” button.
Copies of the CONTRACT DOCUMENTS must be ordered online at www.jacobmartin.com. Orders for CONTRACT DOCUMENTS may include hard copies for pick up, mail out or digital download via www.jacobmartin.com. Upon verification of online payment, hard copies may be picked up at Jacob & Martin, LLC., located at 3465 Curry Lane, Abilene, TX 79606. Cost for hard copies of the CONTRACT DOCUMENTS will be $100.00. Cost for digital download of CONTRACT DOCUMENTS will be $0.00. Contractors must purchase a set of CONTRACT DOCUMENTS to be considered a registered plan holder eligible to bid the project.
This contract is contingent upon release of funds from the Texas Water Development Board (TWDB). Any contract(s) awarded under this Invitation for Bid (IFB), Request for Proposals (RFP), or Request for Qualifications (RFQ) is/are expected to be funded in part by financial assistance from the TWDB. Neither the U.S. Environmental Protection Agency (EPA) or the State of Texas, nor any of its departments, agencies, or employees, are or will be a party to this IFB, RFP, RFQ, or any resulting contract.
The Owner reserves the right to waive any informalities and to reject any or all bids.
Any contract(s) awarded under this Invitation for Bids is/are subject to the American Iron and Steel (AIS) requirements of federal law, including federal appropriation acts and Section 1452 (a)(4) of the Safe Drinking Water Act (42 U.S.C. §300j-12(a)(4), as applicable.
Any contract(s) awarded under this Invitation for Bids is/are subject to the American Iron and Steel (AIS) requirements of federal law, including federal appropriation acts and/or Section 608 of the Federal Water Pollution Control Act.
The City of Rising Star is an affirmative action/equal opportunity employer. All qualified applicants will receive consideration for employment without regard to race, color, sex, age, handicap or national origin. Small and minority firms are encouraged to submit bids for this project.
Equal Opportunity in Employment - All qualified Applicants will receive consideration for employment without regard to race, color, religion, sex (including pregnancy), sexual orientation, gender identity, national origin, age (40 or older), disability, or genetic information. Bidders on this work will be required to comply with the Department of Labor regulations at 41 CFR Part 33 in the award and administration of contracts awarded under TWDB financial assistance agreements. Failure by the Contractor to carry out these requirements is a material breach, which may result in the termination of the awarded financial assistance.
Davis-Bacon prevailing wage requirements apply to the construction, alteration or repair of treatment works carried out, in whole or in part, with assistance made available by the Clean or Drinking Water State Revolving Fund (CWSRF or DWSRF). DOL wage determinations may be obtained online at http://www.wdol.gov/. For additional information on Davis-Bacon Wage Rate Requirements and its applicability to this contract, please consult TWDB Guidance No. DB-0156.
This contract is subject to the Environmental Protection Agency's (EPA) Disadvantaged Business Enterprise (DBE) Program, which includes EPA-approved fair share goals toward procurement of Minority and Women-owned Business Enterprise (M/WBE) businesses. EPA rules require that applicants and prime contractors make a good faith effort to award a fair share of contracts, subcontracts, and procurements to M/WBEs through demonstration of the six affirmative steps. For more details on the DBE Program and the current, applicable fair share goals, please visit www.twdb.texas.gov/dbe.
Project Details
- Project No: TWDB No. 62928 / JM No. 18552
- Owner: City of Rising Star
- JM Office: Abilene
- Project Manager: Luke Van Diest, P.E. / lvandiest@jacobmartin.com
- Admin Contact: Abigayle VanCleave / avancleave@jacobmartin.com
- Phone: (325) 695-1070
- Prebid: No Prebid
- Prebid Date: N/A
- Bid Open Date: January 15, 2025 at 10:00 AM at Rising Star City Hall, 104 N. Miller St., Rising Star, TX 76471
Planholders List
First Name | Last Name | Company | Phone | Contractor Role | |
---|---|---|---|---|---|
William | Dirksen | Techline Pipe | Wdirksen@techlinepipe.com | 2102789670 | Supplier |
Anthony | Finley | Eternal Mark Construction | anthony@eternalmarkconstruction.com | (940) 503-8273 | General Contractor |
Joshua | Macias | 4M Services | joshmm1998@gmail.com | 3252128437 | General Contractor |
Eric | Fields | Environmental Improvements, Inc. | mledger@ei2water.com | (972) 436-2536 | Supplier |
Anthony | Finley | Eternal Mark Construction | anthony@eternalmarkconstruction.com | (940) 503-8273 | General Contractor |
Mark | LaBruyere | Blackhawk Services LLC | marklabruyere@yahoo.com | 8174037879 | General Contractor |
Willie | Strayhorn | Strayhorn Project Developments | wstrayhorn@strayhorndevelopments.com | 2527252282 | General Contractor |
Michael | Arango | Onyx Solutions -Construction/Plumbing/HVAC | michael.a@onyxsolutions.us | 3253740492 | General Contractor |
Darrell | Shortes | Raydon, Inc. | shelley@raydon-inc.com | (254) 559-5012 | Plan Room |
Richard | Fesmire | Broadhead Boring | kfesmire@broadheadboring.com | (512) 560-0368 | General Contractor |
Brent | Estes | Trifecta Equipment Contracting | brent@trifectaec.com | 9723758110 | General Contractor |
Eddie | Green | Flintstone Services | egreen@flintstoneservices.com | 8179444632 | General Contractor |
William | Barnett | Benmark Supply | williambarnett@benmark.com | (325) 692-9889 | Supplier |
DAVID | MCNUTT | APSCO Supply | dmcnutt@apscotx.com | 325-733-4994 | Supplier |
dave | barkey | JWC Environmental | dave.barkey@sulzer.com | 7146184941 | Supplier |
Brent | Behler | Dirty Work Construction | Dirtywork4us@yahoo.com | (325) 998-3096 | General Contractor |
Emily | Morales | JM Pipeline, LLC | emily@jmutilityllc.com | 830-953-1010 | General Contractor |
David | Halford | H4 Construction | courtney@h4construction.com | (254) 434-8555 | General Contractor |
Cody | Looka | Trifecta Equipment Contracting | Cody@TrifectaEC.com | 3254500237 | General Contractor |
Contact Information
Ph: 325-695-1070
Address: 3465 Curry Lane, Abilene, TX 79606, USA
Opening Hours:
Mon - Thurs: 7:30 AM – 5:30 PM
Fri: 8:00 AM – 12:00 PM