TWDB CWSRF No. 73854 / JM No. 19296

City of Grand Saline – Wastewater Treatment Plant Improvements – Re-Bid

Project Description

 

PROJECT INCLUDES:                     The project consists of replacing the aeration system, slide gate, and chlorine contact chamber weir plates, removing existing media and installing new media in existing sludge beds, refurbishing an existing raw sewage pump station, and installing a new air compressor with SCADA for a hydropneumatic tank and associated items at the Grand Saline Wastewater Treatment Plant.

ESTIMATED COST:                         $1,015,000

BID BOND:                                                          5 %

PERFORMANCE/PAYMENT BONDS:         100 %

FUNDING AGENCY:                        Texas Water Development Board (TWDB) / TWDB CWSRF NO. 73854

Copies of the CONTRACT DOCUMENTS must be ordered online at www.jacobmartin.com.  Orders for CONTRACT DOCUMENTS may include hard copies for pick up, mail out or digital download via www.jacobmartin.com.  Upon verification of online payment, hard copies may be picked up at Jacob & Martin, LLC., located at 1925 Fort Worth Highway, Weatherford, Texas 76086.  Cost for hard copies of the CONTRACT DOCUMENTS will be $100.00.  Cost for digital download of CONTRACT DOCUMENTS will be $0.00.  Contractors must purchase a set of CONTRACT DOCUMENTS to be considered a registered plan holder eligible to bid the project.

This contract is contingent upon release of funds from the Texas Water Development Board (TWDB). Any contract or contracts awarded under this Invitation for Bid are expected to be funded in part by financial assistance from the Texas Water Development Board. Neither the State of Texas nor its departments, agencies, or employees are or will be a party to this Advertisement for Bids or any resulting contract. The Owner reserves the right to waive any informalities and to reject any or all bids.

Any contract(s) awarded under this Invitation for Bids is/are subject to the American Iron and Steel (AIS) requirements of Section 608 of the Federal Water Pollution Control Act (33 U.S.C. § 1388).

In addition, the successful bidder must ensure that employees and applicants for employment are not discriminated against because of race, color, religion, sex (including pregnancy), sexual identity, gender identity, national origin, age (40 or older), disability or genetic information.

This contract is subject to the Environmental Protection Agency's (EPA) Disadvantaged Business Enterprise (DBE) Program, which includes EPA-approved fair share goals toward procurement of Minority and Women-owned Business Enterprise (M/WBE) businesses. EPA rules require that applicants and prime contractors make a good faith effort to award a fair share of contracts, subcontracts, and procurements to M/WBEs through demonstration of the six affirmative steps. For more details on the DBE Program and the current, applicable fair share goals, please visit www.twdb.texas.gov/dbe.

Project Details

  • Project No: TWDB CWSRF No. 73854 / JM No. 19296
  • Owner: City of Grand Saline
  • JM Office: Weatherford
  • Project Manager: Nic Kirk, P.E. / nkirk@jacobmartin.com
  • Admin Contact: Katy Stryker / kstryker@jacobmartin.com
  • Phone: (817) 594-9880
  • Prebid: No Prebid
  • Prebid Date: N/A
  • Bid Open Date: September 30, 2024 at 3:00 PM at City Hall, 132 E. Frank Street, Grand Saline, Texas 75140

Select Plan Type:

Planholders List

First Name Last Name Company Email Phone Contractor Role
TroyHotchkissSchneider Electrictroy.hotchkiss@se.com2149571357Supplier
JasonMcNattPierce Pump Companyjmcnatt@piercepumpco.com(469) 515-9890Supplier
BobRussellHartwell Environmental Corporationbrussell@hartwellenv.com(817) 446-9500Supplier
TroyBlackallYork Pump & Equipmenttblackall@dxpe.com903-261-9867Supplier
CathyAldrichWWATERTECH, INC.caldrich@wwatertechinc.com9363725272Supplier
ShannonLackeyThe Kopathean Companyshannon@kopathean.com(830) 613-5923Sub Contractor
JonathanRMckinney And Moore of Texas,LLCjon@mckinneyandmoore.com9036303655General Contractor
ERICCACERESCB3 CONSULTANT HHAULING EQUIPMENTCB3consultanteric@gmail.com9562508325General Contractor
PlansAquisitionConstruct Connectcontent@constructconnect.com8003642059Plan Room
MikeParsonsLone Star Land EnhancementEstimates@LSLEtx.com903-881-8400Sub Contractor
MichaelTaterTSI Laboratories, Inc.tsilabvictoria@gmail.com361-578-6933Sub Contractor
GeorgeKellumKusters Watergeorge.kellum@kusterswater.com864-594-5595Supplier
ScottPerkinsCampbell Electric TX LLCscott@campbellelectrictx.com(817) 675-3383Sub Contractor
SamCaillouetGlobal WETscaillouet@globalwet.com(972) 679-2515Supplier
SamCaillouetGlobal WETscaillouet@globalwet.com(972) 679-2515Supplier
BrentMorganMacaulay Controlsbmorgan@macaulaycontrols.com12812820100Supplier
RandyBrokmeyerCorrosion Control Resourcesrandy@corrosioncr.com(903) 830-2464Sub Contractor
MaryMillerPWXPressbids@pwxpress.com(40) 867-68941General Contractor
GaylanRawdonPump Solutionsgaylan@pumpsolutions.net(817) 403-1140Supplier
EricFieldsEnvironmental Improvements, Inc.mledger@ei2water.com(972) 436-2536Supplier
WarrenMorrowMorrow Enterprises, Inc.bids@morrownm.com5755261178General Contractor
GeraldDowningDowtech Specialty Contractors, Inc.dowtech@dowtechspecialty.com(325) 893-4684General Contractor
CathyAldrichWWATERTECH, INC.caldrich@wwatertechinc.com9363725272Supplier
LisaWelchEverSolve TechnologiesLWELCH@goeversolve.com(888) 755-7573Sub Contractor

Contact Information

Ph: 325-695-1070

Address: 3465 Curry Lane, Abilene, TX 79606, USA

Opening Hours:

Mon - Thurs: 7:30 AM – 5:30 PM

Fri: 8:00 AM – 12:00 PM

0