Fort Griffin SUD – Hubbard Creek Reservoir Crossing

Project Description

 

PROJECT INCLUDES:            The project consists of furnishing and installing approximately 4,760 linear feet of 8" SDR 9 HDPE raw water line through a directional bore crossing Hubbard Creek Reservoir.

A pre-bid conference for the Project will be held on November 20, 2024 at 1:30 PM at Fort Griffin SUD office located at 1180 County Road 109, Albany, Texas 76430 and available through the Teams link provided via addendum. Attendance at the pre-bid conference is encouraged but not required.

ESTIMATED COST:                $1,450,000

BID BOND:                             5%

PERFORMANCE/PAYMENT BOND: 100%

FUNDING AGENCY:              USDA

Contractors must obtain a set of CONTRACT DOCUMENTS online at www.jacobmartin.com by digital download or hard copy to be considered a registered plan holder eligible to bid the project. Cost for digital download of CONTRACT DOCUMENTS will be $0.00.  Hard copies of the CONTRACT DOCUMENTS will be $100.00  All Copies of the CONTRACT DOCUMENTS must be ordered online and are available for pick up, mail out or digital download via www.jacobmartin.com.  Upon verification of online payment, hard copies may be picked up at Jacob & Martin, LLC, located at 1925 Fort Worth Highway, Weatherford, Texas 76086.

This institution is an equal opportunity provider and employer.

Domestic Preference: This project is subject to the Build America, Buy America Act (BABAA) requirements under Title IX of the Infrastructure Investment and Jobs Act (IIJA), Pub. L. 117-58, §§ 70901-70953. Absent an approved waiver, all iron, steel, manufactured products, and construction materials used in this project must be produced in the United States.

Project Details

  • Project No: JM No. 10357
  • Owner: Fort Griffin SUD
  • JM Office: Weatherford
  • Project Manager: Derek Turner, P.E. / adt@jacobmartin.com
  • Admin Contact: Katy Stryker / kstryker@jacobmartin.com
  • Phone: (817) 594-9880
  • Prebid: Non-Mandatory
  • Prebid Date: November 20, 2024 at 1:30 PM at Fort Griffin SUD office located at 1180 County Road 109, Albany, Texas 76430 and available through the Teams link provided via addendum.
  • Bid Open Date: December 10, 2024 at 2:00 PM at Bids shall be delivered to the SUD office at 1180 County Road 109, Albany, TX 76430 by 1:30PM. Bid Open will be at Albany Volunteer Fire Department, 609 Railroad Street, Albany, TX 76430

Select Plan Type:

Planholders List

First Name Last Name Company Email Phone Contractor Role
BrentPartainBontke Brothers Construction Company, Inc.brent@bontkebrothers.com(806) 300-5577General Contractor
RYANMONTGOMERYDOVETAIL DISTRIBUTORSryan@dovetaildistributor.com(325) 660-0812Supplier
LanceConnellyCRC Underground LLCtlconnelly99@gmail.com(254) 541-0042General Contractor
HalSmithIndustrial Municipal Supply Cohal@imsupplyco.com9365482223Supplier
PrestonChevalierOnline Directional Boring - BTSpreston@onlinedirectional.com713-206-3189Sub Contractor
WilliamDirksenTechline PipeWdirksen@techlinepipe.com2102789670Supplier
AllisonTrevinoCore and Mainallison.trevino@coreandmain.com(806) 283-9220Supplier
WilliamRodgersHalcomb Construction LLCwill@halcombconstructionllc.com9185332604General Contractor
HOLLYNIEMANNTIMCO BLASTING & COATINGS, INCHNIEMANN@TIMCO-SERVICES.COM(918) 367-1700General Contractor
CamronFambroFambro Construction, LLCcamronfambro@fambroconstruction.com(254) 485-1169General Contractor
DannySparksUTS Supplydsparks@utssupply.com4054355549Supplier
AmandaHowardamanda@raydon-inc.comamanda@raydon-inc.com325-548-9369Sub Contractor
DerrickGageTriad Service Group, LLC.derrick.gage@triadsvcgrp.com2108236778General Contractor
BretGravesFerguson Waterworksbret.graves@ferguson.com(817) 267-3900Supplier
KyleNelsonRangelinekyle@rangeline.com(817) 239-8536Sub Contractor
MarkStroudACT Pipe and Supplymstroud@actpipe.com(254) 666-6204Supplier
JakeHaydenHaydenshandley@planhub.com(603) 854-2054Plan Room
JuanVasquezRW Jones Heavy Constructionjvasquez@rwjonesheavy.com8173418744General Contractor
GregStoneNewman Regency Groupgstone@newmanregency.com(405) 309-7133Supplier
LeandroRamirezTexas Water Products, Inc.leandro@texaswaterproducts.com817-457-9988Supplier
AustinHughesTCH Undergroundahughes@tchdrillers.com2819932999General Contractor
BryanDolanTrinity Utilities & Boringbryan@trinityutilities.com(817) 235-0619Sub Contractor
TiffanieMeloneDarnell Construction, LLCtmm.ddarnell@suddenlinkmail.com(325) 653-1920General Contractor
KaileyThompsonMikocorp LLCadmin@mikocorp.com8174584425General Contractor
JustinRicoGranbury Excavatingjustin@gxitx.net8179016390General Contractor
BillManninGajeske Inc.bmannin@gajeske.com8065844053Supplier
MartaRubioSkyblue Utilities, Inc.bookkeepingsbui@gmail.com(325) 388-2500General Contractor
PatrickDeCesaroIPS Automation and Electricp.decesaro@ipsaecorp.org806-281-4546Sub Contractor
SaulHernandezMH Civil Constructors, Inc.bid@mh-civil.com(806) 367-6043General Contractor
SteveDelksISCOsteve.delks@isco-pipe.com8003454726Supplier
EmilyMoralesJM Pipeline, LLCemily@jmutilityllc.com830-953-1010General Contractor
LonnieBinnsHousley Grouplbinns@hc-inc.com(214) 354-5899General Contractor
DennisBuszDD&Adennis.busz@construction.com5035043562Plan Room
LoriAdelmanUnderground Solutionsladelman@aegion.com(858) 218-3728Supplier
AndrewVasquezVERTEX MATERIALSinfo@vertexmaterials.com8179411464Supplier
AdisaHusejnovicGEI Consultants, Inc.ahusejnovic@geiconsultants.com3152783581Sub Contractor
MikeKelleyNAE Contractingmkelley@naecontracting.com8179916040General Contractor
BradleyJohnsonB&L Construction Co.bradley@blconstructionco.com(817) 360-6825General Contractor
DAVIDMCNUTTAPSCO Supplydmcnutt@apscotx.com325-733-4994Supplier
BrianGlynnFreese and Nichols, Inc.brian.glynn@freese.com18169184620Supplier
RYANMONTGOMERYDOVETAIL DISTRIBUTORSryan@dovetaildistributor.com(325) 660-0812Supplier
KollinKarrRocking 4K, LLC.KOLLIN@ROCKING4K.COM3253388993Sub Contractor
EricFieldsEnvironmental Improvements, Inc.mledger@ei2water.com(972) 436-2536Supplier
WilliamBarnettBenmark Supplywilliambarnett@benmark.com(325) 692-9889Supplier
KellieGuthrieAR Daniel Constructionkguthrie@danielcs.com469-620-0615Sub Contractor
JackieHowardL. Howard Construction, Inc.lh_estimating@windstream.net(806) 832-5018General Contractor
JackieHowardL. Howard Construction, Inc.lh_estimating@windstream.net(806) 832-5018General Contractor
JustinPraterPrater Dirt Work, LLCJp@praterdirtwork.com(817) 694-8523General Contractor
JasonBowenSummit Utilitiesjason@summit-utilities.com8175381456General Contractor
AndreaBrightMidwest Moleplandesk@midwestmole.com3175451335Sub Contractor
DAVIDMCNUTTAPSCO Supplydmcnutt@apscotx.com325-733-4994Supplier
BlakeMcKayRangeline Utility Servicesblake@rutsconstruction.com682-250-2153General Contractor
MarkStroudACT Pipe and Supplymstroud@actpipe.com(254) 666-6204Supplier
ColtonStevensonMK Constructorscoltons@mkconstructors.com4097690089General Contractor
ScottWamplerScott Wampler Construction & Services LLCscott@swcstexas.com(806) 336-4694General Contractor
DaynanColemanTitan Environmental USAd.coleman@titanenviro.com3465878621Sub Contractor
ColbyEllisTCHcellis@tchdrillers.com(281) 993-2999General Contractor

Contact Information

Ph: 325-695-1070

Address: 3465 Curry Lane, Abilene, TX 79606, USA

Opening Hours:

Mon - Thurs: 7:30 AM – 5:30 PM

Fri: 8:00 AM – 12:00 PM

0