TDA No. CDV23-0362 / JM No. 24134
City of West Tawakoni – 2023 CDBG WTP Improvements – CID 03 – Pumps and Filter Install
Project Description
PROJECT INCLUDES: The proposed project includes installing two new 1,000 gpm raw water pumps at the existing headworks station, and installing piping, valves and media to bring filter #4 online.
ESTIMATED COST: $ 300,800.00
BID BOND: 5%
PERFORMANCE/PAYMENT BONDS: 100%
FUNDING AGENCY: Texas Department of Agriculture / TDA No. CDV23-0362
Contractors: Please note that we have a new feature on our website. Questions should now be entered online, in the box provided for each project prior to the question deadline. To avoid duplicating questions, please review the previously submitted questions posted at the bottom of each project’s web page.
Questions will be automatically directed to and reviewed by the project manager. All project specific questions posted here will be answered via addendum and distributed to all plan holders. Addenda will also be posted to the website and may be accessed by clicking the red “Addendums” button.
Contractors must obtain a set of CONTRACT DOCUMENTS online at www.jacobmartin.com by digital download or hard copy to be considered a registered plan holder eligible to bid the project. Cost for digital download of CONTRACT DOCUMENTS will be $0.00. Hard copies of the CONTRACT DOCUMENTS will be $100.00 All Copies of the CONTRACT DOCUMENTS must be ordered online and are available for pick up, mail out or digital download via www.jacobmartin.com. Upon verification of online payment, hard copies may be picked up at Jacob & Martin, LLC, located at 1925 Fort Worth Highway, Weatherford, Texas 76086.
The project to be constructed will be financed with assistance from the Texas Department of Agriculture (TDA) under the U.S. Department of Housing and Urban Development Community Development Block Grant (CDBG) program and is subject to all applicable Federal and State laws and regulations. Attention is called to the fact that not less than, the federally determined prevailing (Davis-Bacon and Related Acts) wage rate, as issued by the Texas Department of Agriculture Office of Rural Affairs and contained in the contract documents, must be paid on this project. In addition, the successful bidder must ensure that employees and applicants for employment are not discriminated against because of race, color, religion, sex, sexual identity, gender identity, or national origin.
All contractors/subcontractors that are that are debarred, suspended, or otherwise excluded from or ineligible for participation on federal assistance programs may not undertake any activity in part or in full under this project.
The lobbying certification must be submitted with the bid packet to be considered complete and responsive.
The City of West Tawakoni is an Equal Opportunity Employer.
Project Details
- Project No: TDA No. CDV23-0362 / JM No. 24134
- Owner: City of West Tawakoni
- JM Office: Weatherford
- Project Manager: Nic Kirk, P.E. / nkirk@jacobmartin.com
- Admin Contact: Trish Cassaday / tcassaday@jacobmartin.com
- Phone: (817) 594-9880
- Prebid: No Prebid
- Prebid Date: N/A
- Bid Open Date: February 18, 2025 at 1:00 PM at West Tawakoni City Hall, 1533 TX-276, West Tawakoni, TX 75474
Planholders List
First Name | Last Name | Company | Phone | Contractor Role | |
---|---|---|---|---|---|
Matt | Ybarra | MPI | matthew.ybarra@mcwanepi.com | 9035301391 | Supplier |
Kaci | Mayfield | Coburns Supply | kmayfield@coburns.com | 5807475789 | Supplier |
Chase | Cunningham | Ferguson Waterworks | chase.cunningham@ferguson.com | 9039412328 | Supplier |
Kevin | Stryker | Stryker Electric, LLC | kevinstrykerelectric@gmail.com | 9038522060 | Sub Contractor |
Caymen | Ross | Core & Main | caymen.ross@coreandmain.com | 19039412290 | Supplier |
Kevin | Clement | H&H Electrical Contractors, Inc. | kevinc@hhelectrical.biz | 9725240205 | Sub Contractor |
Shannon | Lackey | Kopathean Electric, LLC | shannon@kopathean.com | 8306135923 | Sub Contractor |
Carley | Camp | Elliott Electric Supply | carleycamp@elliottelectric.com | 4699131945 | Supplier |
Jeffery | Martin | Dealers Electrical Supply | jeff@jefferykmartin.com | 9033533974 | Supplier |
Matt | Peterson | A&V Water | matt@estacadointerests.com | 2145465685 | General Contractor |
Chris | Dorman | Underground Utility Supply | Hal@undergroundutilitysupply.com | 9037878840 | Supplier |
Jason | McNatt | Pierce Pump Company | jmcnatt@piercepumpco.com | 4695159890 | Supplier |
Ken | Kochamba | Odessa Pumps | ken.kochamba@dnow.com | 9725221296 | Supplier |
Anthony | Mayes | GDC Industrial Inc. | anthonymayes@groupgdc.com | 9032430526 | General Contractor |
Gerald | Downing | Dowtech Specialty Contractors, Inc. | dowtech@dowtechspecialty.com | 3258934684 | General Contractor |
Erin | Creed | Kore Systems, Inc | admin@koresystems.net | 8773939906 | Sub Contractor |
Chad | Lappin | Superior Equipment Solutions LLC | superiorequipment23@gmail.com | 19035883250 | General Contractor |
Eric | Fields | Environmental Improvements, Inc. | mledger@ei2water.com | 9724362536 | Supplier |
Plan | Aquisition | Construct Connect | content@constructconnect.com | 8003642059 | Plan Room |
Jack | Treadwell | Summit Solutions, Inc. | jack@summitsolutionsus.com | 6782837355 | General Contractor |
DANNY | JOHNSON | GDC INDUSTRIAL | dannyjohnson@groupgdc.com | 9032430428 | General Contractor |
Brett | Gartner | Expanse Electrical | brett.gartner@expanseelectrical.com | 7203200722 | Sub Contractor |
TJ | McKinney | McKinney and Moore of Texas, LLC | tj@mckinneyandmoore.com | 9033603655 | General Contractor |
Brian | Trout | Axis Water Technologies | brian.trout@axiswater.com | 4325286656 | Sub Contractor |
Marc | Cashion | Global Pump Solutions | marc@gpspumps.com | 8172407728 | Supplier |
Kyle | Nelson | Rangeline | kyle@rangeline.com | 8172398536 | Sub Contractor |
Georgia | Good | RLC Controls, Inc. | georgia@rlccontrols.com | 5129666366 | Sub Contractor |
Mary | Miller | PWXPress | bids@pwxpress.com | 4086768941 | General Contractor |
CODY | HAMBLIN | Leonard Water Services | colin@leonardwaterservices.com | 3256691903 | General Contractor |
Bryan | Weemes | Xylem, Inc. (Flygt Products) | bryan.weemes@xylem.com | 2149529301 | Supplier |
Randy | Key | Zone Industries | rkey@zoneindustires.com | 8179125151 | Supplier |
Questions
Company | Name | Question |
---|---|---|
GDC Industrial Inc. | Anthony Mayes | On Proposed Pump Site Alternate Sheet 06- "Proposed Headworks Site"- Will the existing 6" WL to clarifiers be abandoned in place or will this require demo to allow installation of the 80LF of 8"? |
Odessa Pumps | Ken Kochamba | Section 11 05 03 VTP's - Drawings on Sheet 05 - 08 - Can you please provide more detail on the pump mounting elevation (or discharge pipe elevation) and bottom of wet well elevation, to determine total pump length. |
Contact Information
Ph: 325-695-1070
Address: 3465 Curry Lane, Abilene, TX 79606, USA
Opening Hours:
Mon - Thurs: 7:30 AM – 5:30 PM
Fri: 8:00 AM – 12:00 PM