CB-2548 / JM No. 24366

City of Abilene – I-20 Utility Relocates – Work Authorization No.1

Project Description

 

PROJECT INCLUDES:         The project includes the water, sewer and effluent reuse relocations that are required to accommodate a TXDOT roadway project along IH-20 located between FM 600 to Hwy 351.

ESTIMATED COST:                $12,000,000

BID BOND:                             5%

PERFORMANCE/PAYMENT BOND: 100%

FUNDING AGENCY:              City of Abilene / Abilene Contract No. CB-2548

Contractors: Please note that we have a new feature on our website. Questions should now be entered online, in the box provided for each project prior to the question deadline. To avoid duplicating questions, please review the previously submitted questions posted at the bottom of each project’s web page.

 

Questions will be automatically directed to and reviewed by the project manager. All project specific questions posted here will be answered via addendum and distributed to all plan holders. Addenda will also be posted to the website and may be accessed by clicking the red “Addendums” button.

 

This project is subject to the Build America, Buy America Act (BABA) requirements under Title IX of the Infrastructure Investment and Jobs Act (IIJA), Pub. L. 117-58, §§ 70901-70953. Absent an approved waiver, all iron, steel, manufactured products, and construction materials used in this project must be produced in the United States.

 

Copies of the CONTRACT DOCUMENTS must be ordered online at www.jacobmartin.com.  Orders for CONTRACT DOCUMENTS may include hard copies for pick up, mail out or digital download via www.jacobmartin.com.  Upon verification of online payment, hard copies may be picked up at Jacob & Martin, LLC., located at 3465 Curry Lane, Abilene, TX 79606.  Cost for hard copies of the CONTRACT DOCUMENTS will be $100.00.  Cost for digital download of CONTRACT DOCUMENTS will be $0.00.  Contractors must purchase a set of CONTRACT DOCUMENTS to be considered a registered plan holder eligible to bid the project.

 

Project Details

  • Project No: CB-2548 / JM No. 24366
  • Owner: City of Abilene
  • JM Office: Abilene
  • Project Manager: Tristan King, P.E. / tking@jacobmartin.com
  • Admin Contact: Abigayle VanCleave / avancleave@jacobmartin.com
  • Phone: (325) 695-1070
  • Prebid: Mandatory
  • Prebid Date: A mandatory Pre-Bid Conference will be held on July 24, 2025 at 2:00 PM in the Jacob & Martin Training Room, 3866 Hi-Tech Place, Abilene, TX 79606.
  • Bid Open Date: August 7, 2025 at 2:00 PM at Purchasing Department at City Hall, 555 Walnut Street, Suite 201-A, Abilene, Texas

Select Plan Type:

Planholders List

First Name Last Name Company Email Phone Contractor Role
AndrewTrujilloTenoch Distribution LLCatrujillo@tenochdistribution.com12102162491Supplier
ZacReevesUnited Rentals FS - Bypasszreeves@ur.com8175865009Sub Contractor
MicahReevesConcrete Conservation LLC / SpectraShieldmreeves@spectrashield.com(254)315-4473Sub Contractor
KyleNelsonRangelinekyle@rangeline.com8172398536Sub Contractor
HaydenJohnsonTimco Blasting & Coatingshjohnson@timco-services.com19182611947General Contractor
ChristopherPatePate Garver, LPestimating@pategarver.com8329171611General Contractor
BlakeSimonsFerguson Waterworksblake.simons@ferguson.com2144154885Supplier
BradleyA LewisUnited Rentals Fluid Solutionsblewis7@ur.com6824464959Sub Contractor
CraigFisherWestlake Pipe and Fittingscfisher1@westlakepipe.com817/266-3775Supplier
SusanScheppsScruggssschepps@scruggsco.com8323144335Supplier
EduardoGarciaSmith Pump Companyeduardog@smithpump.com8174553689Supplier
SydneyBeverageBontke Brothers Construction Companysydney@bontkebrothers.com3256776276Sub Contractor
TerriNguyenAmerican Cast Iron Pipe Companytnguyen@american-usa.com12053257081Supplier
JamesMartinezJAMCO Drillingjamcodrilling@gmail.com2147013888Sub Contractor
DerrickGageTriad Service Group, LLCdakota.west@triadsvcgrp.com2146209414General Contractor
ChristopherPatePate Garver LPchris.pate@pategarver.com+19366890413General Contractor
JoshFLudDeerWood ConstructionJflud@deerwoodinc.com18063921975General Contractor
LauraJevneSpiess Constructionbids@sccitanks.com8059375859General Contractor
MattRottmanXylemmatt.rottman@xylem.com2142886601Supplier
CamronFambroFambro Construction, LLCcamronfambro@fambroconstruction.com2544851169General Contractor
ThomasWestermanFerguson Waterworksthomas.westerman@ferguson.com4322538194Supplier
AnthonyFinleyEternal Mark Constructionanthony@eternalmarkconstruction.com9405038273General Contractor
TylerBeltPioneer Supplytbelt@pioneersupplyok.com14057947705Supplier
JohnWinchesterXylemjohn.winchester@xylem.com14695801180Sub Contractor
EstimatingMXMX Construction Services INCestimating@mxconstructionservices.com2149989960General Contractor
RonnieRendonAlpha Construction & Engineering LLC.ronnie.theaceutilities@gmail.com8064540119General Contractor
AaronStocktonAcadia Servicesaaron@acadiatx.com18178232875General Contractor
YvonneAlvarezElla S.A. Contracting, L.P.yalvarez@ellasa.com16196470886General Contractor
IohnPulliamTurkey Creek HDDjohn@tcreek.com8069108770General Contractor
DustinBarberJC WInwaterdlbarber@winsuppply.com8179940415Supplier
DustinBarberJC WInwaterdlbarber@winsuppply.com8179940415Supplier
DAVIDMCNUTTAPSCO Supplydmcnutt@apscotx.com3257334994Supplier
TaylorKennedyCurtis Service Companytkennedy@curtisserviceco.com+18066627052General Contractor
AllisonTrevinoCore and Mainallison.trevino@coreandmain.com8062839220Supplier
WilliamGeiserBelt Construction of Texasbill@beltinc.com8175058213General Contractor
DAVIDMCNUTTAPSCO Supplydmcnutt@apscotx.com3257334994Supplier
JonathanZiegnerUtility Contractors of Americajonathan@ucatexas.com8068632642General Contractor
JoshuaCoonrodTellus Services, LLCJoshua@tellusservices.com8176024615Sub Contractor
ClintWilsonWestern Municipal Construction of Texas, LLCtx-bids@wmc-i.com9406480020General Contractor
DAVIDMCNUTTAPSCO Supplydmcnutt@apscotx.com3257334994Supplier
KarissaBlackburnAcadia Serviceskarissa@acadiatx.com2144370843General Contractor
JoseTellezMH Civil Constructors, Inc.bid@mh-civil.com8063676043General Contractor
MartaRubioSkyblue Utilities, Inc.bookkeepingsbui@gmail.com3253882500General Contractor
AlexO'NeilKingrey Industries, LLCalex@kingrey.us2149689952Supplier
JonathanB.4 Way Haulersjonathan@4wayhaulers.com13253703700Sub Contractor
EmilyMoralesJM Pipeline, LLCemily@jmutilityllc.com8309531010General Contractor
KAYLANBURKEAmtek USAamtek.austin@amtekusa.com2813764577Plan Room
JeremyFinleyFinco Servicesjeremy@fincoservicestx.com2546317165General Contractor
PlanAquisitionConstruct Connectcontent@constructconnect.com8003642059Plan Room
MacCappsBelt Constructionmac@beltinc.com9039081190General Contractor
RustyBuckleyBenmark Supply Co.rustybuckley@benmark.com13253104240Supplier
jimcrawfordM5 Utilities, LLCjim@m5utilities.com18303319044General Contractor
EricBarronDorado Construction Grouperic.barron@doradoconstructiongroup.com3253742386Sub Contractor
AdamHamedSCCIahamed@sccitanks.com18059375859General Contractor
JacobPhillipsAmericanjakephillips@american-usa.com19137048209Supplier
TedZamoraElla SA Contractingtzamora@ellasa.com12106082537General Contractor
JosueWilliamsWest Texas AGCabilene@wtagc.org3256767447Plan Room

Questions

Company Name Question
Benmark Supply William Barnett On sheet 11, the effluent reuse bore, fittings are called out as 27" DI MJ fittings, these do not exist. It appears that this is a pressure line, if it is ASTM F679 PS115 is a gravity sewer spec and not pressure rated, would need to use a pressure rated pipe in this application.
MX Construction Services INC Estimating MX thank you
Ella SA Contracting Ted Zamora Will both the sewer and the water bores require annual grouting between casing and pipe? Or will it be only the sewer?
Ella SA Contracting Ted Zamora Domestic materials, specifically butterfly valves for large diameter pipe, lead times are 120 calendar days after approved submittals. We believe that there should be more days added to the contract for manufacturing this material.
American Jacob Phillips Will Ductile Iron Pipe be allowed to bid as an alternate material for the waterline segments on this project that are 16" and Larger? Recent bid results have shown DIP to be cost competitive in these diameters.

Contact Information

Ph: 325-695-1070

Address: 3465 Curry Lane, Abilene, TX 79606, USA

Opening Hours:

Mon - Thurs: 7:30 AM – 5:30 PM

Fri: 8:00 AM – 12:00 PM

0