JM No. 24103

EULA ISD – BUS & MAINTENANCE FACILITY

Project Description

 

PROJECT INCLUDES:         Construction of a new bus/maintenance facility & covered bus parking.

ESTIMATED COST:             $2,500,000

PAYMENT/PERFORMANCE BONDS: 100%

BID BOND:                           5%

The deadline to submit questions to the Architect is 5:00 PM, October 31, 2025. All questions shall be submitted electronically on the Jacob & Martin, LLC website.

Project Details

  • Project No: JM No. 24103
  • Owner: Eula ISD
  • JM Office: Abilene
  • Project Manager: Tyser Robertson, AIA, NCARB / trobertson@jacobmartin.com
  • Admin Contact: Katy Stryker / kstryker@jacobmartin.com
  • Phone: (325) 695-1070
  • Prebid: No Prebid
  • Prebid Date: N/A
  • Bid Open Date: November 13, 2025 at 2:00 PM at Sealed proposals should be addressed to: Jacob & Martin, LLC, Attn: Tyser Robertson, AIA, on behalf of Eula ISD, 3465 Curry Lane, Abilene, TX 79606. The Proposals will also be opened at this address.

Select Plan Type:

Planholders List

First Name Last Name Company Email Phone Contractor Role
NathanLundquistGeneco Technologies, LLCNathan@genecotech.com3255140082Sub Contractor
AllisonTrevinoCore and Mainallison.trevino@coreandmain.com8062839220Supplier
JordanParnellMadewell Constructionparnell@madewell-construction.com18067735362General Contractor
KollinKarrRocking 4K, LLC.KOLLIN@ROCKING4K.COM3253388993Sub Contractor
AnnieParchmanWinston Water Cooleraparchman@winstonwatercooler.com4323524472Supplier
BryanBrownFletco Constructionbryan.b@fletcoconstruction.com(830) 992-3029General Contractor
RichardDingmanRDI EQUIPMENTrdingman@rdiequipment.com3204024085Sub Contractor
JamesBaahConstructConnectcontent@constructconnect.com8003642059Plan Room
MiguelMicheltorenaAir & Lube Systems, Inc.mmicheltorena@airandlube.com9166427201Sub Contractor
JakeHaydenHaydenshandley@planhub.com6038542054General Contractor
TJAndradeMadewell Constructiontj@madewell-construction.com8065763268General Contractor
AdamBeikmannOPREX Constructionbids@oprex.com8067124000General Contractor
MaryMillerPWXPressbids@pwxpress.com4086768941Plan Room
VenkateshSivaBlackridge Research & consultingvenkatesh@blackridgeresearch.com(917) 993-7467Plan Room
BrandtCoxCollier Constructionbrandt@colliertx.com4322690853General Contractor
JDCoffeeTeinert Constructionjcoffee@teinert.com3257041211General Contractor
DonnyWattsThe Crowe Group Incbids@crowegroup.biz3256760132General Contractor
SteveJusticeJustice Construction Inc.steve@sjusticeconstruction.com3256950427General Contractor

Questions

Company Name Question
OPREX Construction Adam Beikmann There is a reference in the Division 13 specs calling for the primer to be SSPC-20 zinc rich primer. This is not a standard metal building primer and is extremely cost prohibitive. A.) Would the owner be willing to deviate to SSPC-15 standard rust inhibitive metal building primer? Or; B.) Would the owner be willing to deviate to SSPC-15 standard rust inhibitive metal building primer in all locations that are enclosed and galvanized finish for all steel exposed to the elements?
OPREX Construction Adam Beikmann The plans call out a 10' ft chain link double gate in the middile of the ameristar fence. Is this supposed to be ameristar fencing to match the rest of the fence or will it remain chain link?
OPREX Construction Adam Beikmann What is the basis of design for the metal building awning design?