TWDB No. 62863 / JM No. 19119

City of Ropesville – Water Treatment Improvements – Contract 1: Water Treatment Plant

Project Description

 

A non-mandatory Pre-Bid Conference will be held via Zoom Meeting (information below), at 2:00 PM on July 15, 2026, to discuss the scope of the project and answer any questions prospective bidders may have concerning specifics of the project. The Contractor or his designated representative may attend.

-------------------------------------------------------------------------------------------

Topic: Non-mandatory Pre-bid Meeting for Ropesville

Time: Jul 15, 2026 02:00 PM Central Time (US and Canada)

Join Zoom Meeting

https://jacobmartin.zoom.us/j/87021581034

Meeting chat link

https://jacobmartin.zoom.us/launch/jc/87021581034

Meeting ID: 870 2158 1034

---

One tap mobile

+15642172000,,87021581034# US

+16469313860,,87021581034# US

---

Join by SIP

Join instructions

https://jacobmartin.zoom.us/meetings/87021581034/invitations?signature=mM9F8Tr9oksdP6Ouau2e2yoh7TrS0TGA47Yq5j5Zdfo

-------------------------------------------------------------------------------------------

PROJECT INCLUDES:                     The installation of an 150 gpm RFRO WTP along with pumps, equipment, piping, and appurtenances.

ESTIMATED COST:                         $1,300,000

BID BOND:                                        5 %

PERFORMANCE/PAYMENT BONDS:         100 %

FUNDING AGENCY:                        Texas Water Development Board (TWDB) / TWDB No. 62863

Contractors: Please note that we have a new feature on our website. Questions should now be entered online, in the box provided for each project prior to the question deadline. To avoid duplicating questions, please review the previously submitted questions posted at the bottom of each project’s web page.

 

Questions will be automatically directed to and reviewed by the project manager. All project specific questions posted here will be answered via addendum and distributed to all plan holders. Addenda will also be posted to the website and may be accessed by clicking the red “Addendums” button.

Copies of the CONTRACT DOCUMENTS must be ordered online at www.jacobmartin.com.  Orders for CONTRACT DOCUMENTS may include hard copies for pick up, mail out or digital download via www.jacobmartin.com.  Upon verification of online payment, hard copies may be picked up at Jacob & Martin, LLC., located at 3465 Curry Lane, Abilene, TX 79606.  Cost for hard copies of the CONTRACT DOCUMENTS will be $100.00.  Cost for digital download of CONTRACT DOCUMENTS will be $0.00.  Contractors must purchase a set of CONTRACT DOCUMENTS to be considered a registered plan holder eligible to bid the project.

A certified check or bank draft, payable to the order of City of Ropesville, negotiable U.S. Government bonds (at par value) or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to five percent (5%) of the total bid (Water Code 17.183) shall be submitted with each bid. The Contractor shall utilize a surety company which is authorized to do business in Texas in accordance with Surety Bonds and Related Instruments, Chapter 3503 of the Insurance Code.

This contract is contingent upon release of funds from the Texas Water Development Board (TWDB).

Any contract(s) awarded under this Invitation for Bid (IFB), Request for Proposals (RFP), or Request for Qualifications (RFQ) is/are expected to be funded in part by financial assistance from the TWDB. Neither the U.S. Environmental Protection Agency (EPA) or the State of Texas, nor any of its departments, agencies, or employees, are or will be a party to this IFB, RFP, RFQ, or any resulting contract.

The Owner reserves the right to waive any informalities and to reject any or all bids.

For SRF Equivalency projects approved under the 2022 IUP or earlier –Any contract(s) awarded under this Invitation for Bids is/are subject to the American Iron and Steel (AIS) requirements of federal law, including federal appropriation acts and/or Section 608 of the Federal Water Pollution Control Act.

Equal Opportunity in Employment - All qualified Applicants will receive consideration for employment.

Davis-Bacon prevailing wage rates are applicable. Davis-Bacon prevailing wage requirements apply to the construction, alteration or repair of treatment works carried out, in whole or in part, with assistance made available by the Clean Water State Revolving Fund (CWSRF) or a construction project financed, in whole or in part, from the Drinking Water State Revolving Fund (DWSRF).

For additional information on Davis-Bacon Wage Rate Requirements and its applicability to this contract, please consult TWDB Guidance No. DB-0156.

 

Project Details

  • Project No: TWDB No. 62863 / JM No. 19119
  • Owner: City of Ropesville
  • JM Office: Lubbock
  • Project Manager: Allen Phillips, P.E. / aphillips@jacobmartin.com
  • Admin Contact: Katy Stryker / kstryker@jacobmartin.com
  • Phone: (806) 368-6375
  • Prebid: Non-Mandatory
  • Prebid Date: July 15, 2026 @ 2:00 PM via Zoom
  • Bid Open Date: July 30, 2026 at 2:00 PM at City Hall, 107 Hockley Main St., Ropesville, TX 79358

Select Plan Type:

Planholders List

First Name Last Name Company Email Phone Contractor Role
CathyAldrichWWaterTech, Inc.caldrich@wwatertechinc.com9363725272Supplier
GeraldPompaHartwell Environmentalgpompa@hartwellenv.com(512) 350-1398Supplier
CharlesSchniedersCummins Sales and Servicecharlie.a.schnieders@cummins.com(214) 676-0179Supplier
Marymillerpwxpressbids@pwxpress.com4086768941Plan Room
VenkateshSivaBlackridge Research & Consultingvenkatesh@blackridgeresearch.com(917) 993-7467Plan Room
Marymillerpwxpressbids@pwxpress.com4086768941Plan Room
TroyToddTEC Systems Groupttodd@tecsystemsgroup.com3168389100Sub Contractor
CourtneySledgeRaider Fence, LLCinfo@raiderfence.com+18066208880Sub Contractor
DennisEmrieEnvironmental Improvements (EI2)demrie@ei2water.com5052384212Supplier
MattRottmanGrundfosmrottman@grundfos.com19453814391Supplier
JasonMcNattPierce Pump Companyjmcnatt@piercepumpco.com4695159890Supplier
TroyLacobeeNewman Regency Grouptroy@newmanregency.com18172642713Supplier
ChristopherEustaceEverSolve Technologiesceustace@goeversolve.com18064965000Sub Contractor
ShawnEllisFrietze Industrial Service Technicianselliss@fist.llc(806 )842-3592Sub Contractor
DavidDuffeeIndependent ElectricDavid@ind-elec.com8065493707Sub Contractor
VictorRanawatTaknekvictor.ranawat@taknek.com9406411041General Contractor
RyanWoodTraC-n-trol, Inc.bidding@tracntrol.com5129305721Sub Contractor
EdithHallPaso Robles Tank, Inc.hemetreception@pasoroblestank.com9519255022Sub Contractor
PollyVannV-tech Environmental Servicesinfo@v-teches.com(806) 748-1700Sub Contractor
BrittanySimmonsPrecision Pump Systemsbsimmons@zoneindustries.com8179125151Supplier
dustinallemanFluence Corpdalleman@fluencecorp.com6159928694Supplier
TylerBeltPioneer Supplytbelt@pioneersupplyok.com14057947705Supplier
ElEstrabelaConstructConnectEl.Estrabela@constructconnect.com2402219248Plan Room
TaylorLittleDorado Construction Grouptaylor.little@doradoconstructiongroup.com(325) 656-5242General Contractor
JASONBEHLERJ-Cojbehler.jco@gmail.com(325) 998-4283General Contractor
ChristopherEustaceEverSolve Technologiesceustace@goeversolve.com18064965000Sub Contractor
ScottWamplerScott Wampler Construction ServicesBids@swcstexas.com18063364694General Contractor
TressieMooreBulldog Steel Products, Inc.tressie@bulldogsteel.com3258935806General Contractor
DaynanColemanTitan Environmental USAd.coleman@titanenviro.com3465878621Sub Contractor
DanielIzzardBrown-McKee, Inc.danieli@brownmckee.com8067454511General Contractor
BillyDozierCore and Mainbilly.dozier@coreandmain.com4055507817Supplier
WilliamSebastianThunder Well Servicebryant@thunderwells.com8067813061General Contractor
JimCrawfordM5 Utilities, LLCjcrawford@m5utilities.com(830) 331-9044General Contractor
JacquelineWhitmoreJCS Industries, Inc.JACKIE@JCSINDUSTRIES.US.COM(281) 353-2100Sub Contractor
LisaWelchMaverick Tech Solutionslisa@mav-io.com5126595472Sub Contractor
PatrickDeCesaroDeCesaro Integration Services, LLCpatrick@disscada.com806-281-4546Sub Contractor
CodyMatherneSpectrum Biotechnologies, LLCcmatherne@Spectrumwater.com2252413040Supplier
ChrisKeslerTurkey Creekckesler@tcreek.com806-679-7123General Contractor
RayPenaZone Industriesrpena@zoneindustries.com8322785965Supplier
RyanSpeirCromrspeir@cromcorp.com(352) 3392064General Contractor
ShannonLackeyKopathean Electric, LLCshannon@kopathean.com8306135923Sub Contractor
ROGERPENSESpot on Pump and Supplyroger.spotonpump@gmail.com18064630026Supplier
MichaelCarpenterEnvironmental Improvements, Inc.mledger@ei2water.com9724362536Supplier
NoahHornStewart Brothers Drilling Companynoah@stewartbrothers.com3255134487General Contractor
JeredBiesemeyerAll Clear Pumping and Sewerjered@allclearmo.com5736340165General Contractor
JDCoffeeTeinert Constructionjcoffee@teinert.com3257041211General Contractor
JakeHawkinsD&R Tank Companybids@drtank.com5058731101Sub Contractor
TaylorKennedyCurtis Service Companytkennedy@curtisserviceco.com+18066627052General Contractor
DelwinClevengerClevenger Water Well Servicestcwwservices@gmail.com4322122775Sub Contractor
Marymillerpwxpressbids@pwxpress.com4086768941Plan Room
VenkateshSivaBlackridge Research & consultingvenkatesh@blackridgeresearch.com(917) 993-7467Plan Room
ConnorHoelscherTexas Water and Soil Company, Inc.connor@texaswaterandsoil.com3256569813General Contractor
JackieHowardL. Howard Construction, Inc.lh_estimating@windstream.net8068325018General Contractor
JimCrawfordM5 Utilities, LLCjcrawford@m5utilities.com(830) 331-9044General Contractor
GeneJones, Jr.Maguire Iron, Inc.bidreports@maguirewater.com6053349749Plan Room
MikeNeillJCH, Inc.mike.neill@jchinc.com8063365913Supplier
KyleNelsonRangelinekyle@rangeline.com8172398536Sub Contractor
GeraldDowningDowtech Specialty Contractors, Inc.dowtech@dowtechspecialty.com3258934684General Contractor
JoshFLudDeerWood ConstructionJflud@deerwoodinc.com18063921975General Contractor
AARONIVYNorit Activated CarbonAaron.Ivy@Norit.com9037029750Sub Contractor
WilliamBarnettBenmark Supplywilliambarnett@benmark.com3256929889Supplier
RichardFesmireBroadhead Boringkfesmire@broadheadboring.com(512) 560-0368General Contractor
ScottWamplerScott Wampler Construction ServicesBids@swcstexas.com18063364694General Contractor
JDVerfurthVerfurth ElectricVerfurthElectric@Outlook.com3256035336Sub Contractor
SARAHKELLYAmtek USAamtek.austin@amtekusa.com2813764577Plan Room

Questions

Company Name Question
Hydro Resources - Mid Continent, Inc. Amy Majors Please send specs and plans.
pwxpress mary miller na
Scott Wampler Construction Services Scott Wampler Can you please provide the preffered manufacturerer for the pumps and other supplies on contrcat 1 that is not pipe
Fluence Corp dustin alleman Confirm this is AIS only, not BABA, for vendor equipment submittals. Confirm whether skid-internal 316SS piping, flanges, valves, frame, and anchor hardware need AIS certification or are treated as exempt mechanical-equipment components. Provide Sheet G-2 list of City-purchased AIS materials. Confirm the governing capacity: bid ad says 150 gpm RFRO WTP, RO spec says 110 gpm permeate, and performance section shows 162 gpm feed / 13.6 gpm reject / 89% recovery. Please clarify the high-pressure RO skid flange material requirement in Section 46 01 01, 2.09.A.4. The specification lists “Flanges: 316 SS, ASTM A105,” but ASTM A105 is carbon steel, while the same section states the flange material shall be 316 stainless steel. Please confirm that high-pressure RO flanges shall be ASME/ANSI B16.5 Class 300 raised-face slip-on flanges in 316 stainless steel, ASTM A182 F316/F316L, and that the ASTM A105 reference is not applicable. Confirm whether air compressor is by contractor/others or part of RFRO supplier package. Confirm full chemical feed scope: acid + antiscalant only, or acid + antiscalant + SMBS + caustic.

Contact Information

Ph: 325-695-1070

Address: 3465 Curry Lane, Abilene, TX 79606, USA

Opening Hours:

Mon - Thurs: 7:30 AM – 5:30 PM

Fri: 8:00 AM – 12:00 PM

0