TDA No. CDV25-0126 / JM No. 25107

City of Rochester – Ground Storage Tank Improvements

Project Description

 

PROJECT INCLUDES:         The construction of a new 126,000-gallon welded steel ground storage tank (or Alternate 75,000-gallon) at the Knox City site and a new 20,000-gallon welded steel ground storage tank at the Rochester Pump Station site. Improvements also include associated yard piping, connections to the existing water system, and demolition and abandonment of existing ground storage tanks.

ESTIMATED COST:             $600,000

BID BOND:                           5%

PERFORMANCE/PAYMENT BONDS:      100%

FUNDING AGENCY:           Texas Department of Agriculture / TDA No. CDV25-0126

Contractors: Please note that we have a new feature on our website. Questions should now be entered online, in the box provided for each project prior to the question deadline. To avoid duplicating questions, please review the previously submitted questions posted at the bottom of each project’s web page.

 

Questions will be automatically directed to and reviewed by the project manager. All project specific questions posted here will be answered via addendum and distributed to all plan holders. Addenda will also be posted to the website and may be accessed by clicking the red “Addendums” button.

Copies of the CONTRACT DOCUMENTS must be ordered online at www.jacobmartin.com.  Orders for CONTRACT DOCUMENTS may include hard copies for pick up, mail out or digital download via www.jacobmartin.com.  Upon verification of online payment, hard copies may be picked up at Jacob & Martin, LLC., located at 3465 Curry Lane, Abilene, TX 79606.  Cost for hard copies of the CONTRACT DOCUMENTS will be $100.00.  Cost for digital download of CONTRACT DOCUMENTS will be $0.00.  Contractors must purchase a set of CONTRACT DOCUMENTS to be considered a registered plan holder eligible to bid the project.

The project to be constructed will be financed with assistance from the Texas Department of Agriculture (TDA) under the U.S. Department of Housing and Urban Development Community Development Block Grant (CDBG) program and is subject to all applicable Federal and State laws and regulations. Attention is called to the fact that not less than, the federally determined prevailing (Davis-Bacon and Related Acts) wage rate, as issued by the Texas Department of Agriculture Office of Rural Affairs and contained in the contract documents, must be paid on this project. In addition, the successful bidder must ensure that employees and applicants for employment are not discriminated against because of race, color, religion, sex, sexual identity, gender identity, or national origin. Further, this contract must comply with Buy America Build America (BABA) requirements.

All contractors/subcontractors that are debarred, suspended, or otherwise excluded from or ineligible for participation on federal assistance programs may not undertake any activity in part or in full under this project.

The lobbying certification must be submitted with the bid packet to be considered complete and responsive.

The City of Rochester is an Equal Opportunity Employer.

 

Project Details

  • Project No: TDA No. CDV25-0126 / JM No. 25107
  • Owner: City of Rochester
  • JM Office: Lubbock
  • Project Manager: Allen Phillips, P.E. / aphillips@jacobmartin.com
  • Admin Contact: Katy Stryker / kstryker@jacobmartin.com
  • Phone: (806) 368-6375
  • Prebid: No Prebid
  • Prebid Date: N/A
  • Bid Open Date: November 19, 2026 at 2:00 PM at Rochester City Hall, 214 Carothers Avenue, Rochester, TX 79544

Select Plan Type:

You must be logged in to submit Questions.

Login

Planholders List

First Name Last Name Company Email Phone Contractor Role
NathanielEngelsRiley Industrial Services, Inc.natee@rileyindustrial.com5053274947General Contractor
RamonCarrascoKleinman Companyramoncarr1972@gmail.com4326649057Sub Contractor
VennessaJimenezPaso Robles Tank, Incvjimenez@pasoroblestank.com9519255022Sub Contractor
DarleneBaker-MannDodge Constructiondarlene.baker-mann@construction.com8443263826Plan Room
MichaelStubbsConstructConnectVince.Sienes@ConstructConnect.com2402219248General Contractor
WilliamBarnettBenmark Supplywilliambarnett@benmark.com3256929889Supplier
DillonHerdegenPittsburg Tankdherdegen@pttg.com270-853-7162Sub Contractor
RichardWillisGraybar Electric Companyrichard.willis@graybar.com3257942117Supplier
DarrylHarrisTank & Vessel Builders, LPkseago@tankandvesselbuilders.com(325) 854-8450General Contractor
CassidyBuchanan1836 Construction1836constructionbidding@gmail.com9407815584Sub Contractor
MatthewZillesCK Powermzilles@ckpower.com6822980874Supplier
TressieMooreBulldog Steel Products, Inc.tressie@bulldogsteel.com3258935806Sub Contractor
GeraldDowningDowtech Specialty Contractors, Inc.dowtech@dowtechspecialty.com(325) 893-4684General Contractor
VenkateshSivaBlackridge Research & Consultingvenkatesh@blackridgeresearch.com(917) 993-7467Plan Room
GageAaronLoftin Equipmentgaaron@loftinequip.com4692618190Supplier
JakeHawkinsD&R Tank Companybids@drtank.com5058731101Sub Contractor
DanielIzzardBrown-McKee, Inc.danieli@brownmckee.com8067454511General Contractor
BrentA TaylorTTE, LLCBrent@ttellc.us5124610806General Contractor
MattLoundaginTanco Engineeringmloundagin@tancoeng.com970-776-4209General Contractor
ClintCarlileCarlile Specialty Contractors, LLCclint@carlilespecialty.com(325) 370-1561General Contractor
brycebutlerRPM Builds, LLCbryce.butler1@gmail.com9135754889Supplier
KaylanBurkeAmtek DFWamtek.dfw@amtekusa.com(281) 376-4577Plan Room
DavidDuffeeIndependent ElectricDavid@ind-elec.com8065493707Sub Contractor
SarahKellyAmtek USAamtek.austin@amtekusa.com(281) 376-4577Plan Room
ConnorHoelscherTexas Water and Soil Company, Inc.connor@texaswaterandsoil.com3256569813General Contractor
GeneJones, Jr.Maguire Iron, Inc.bidreports@maguirewater.com6053349749General Contractor

Questions

Company Name Question
D&R Tank Company Dave DeCoste The tank drawings call for a Varec level indicator or approved equal. Can the tank manufacturer supply its own level indicator?
D&R Tank Company Dave DeCoste The paint specification call for two coats of Tnemec 21 (High Solids) to be used on the interior of the tank. Can one coat of Tnemec 22 (100% Solids) 20 to 24 mils be used in lieu of Tnemec 21?
D&R Tank Company Dave DeCoste The pain specifications call for Tnemec 94-H2O Hydro-Zinc primer. Can Tnemec 91-H2O Hydro-Zinc be used as well?
D&R Tank Company Dave DeCoste Please confirm if the 1/4” plate minimum requirement shown on the drawings is just for the ring steel of the shell, or also a requirement for the roof plate as well.
D&R Tank Company Dave DeCoste The tank drawings show a flat head vent. Can the tank manufacturer provide its own mushroom style vent?
D&R Tank Company Dave DeCoste The tank drawings show a PVC inlet riser on the interior of the tank. Can the riser be made of Sch. 40 steel pipe in lieu of PVC?
D&R Tank Company Dave DeCoste The tank drawings show one 30" shell manway per tank. AWWA requires two manway 180 degrees apart. Please verify that two shell manways will be required.
D&R Tank Company Dave DeCoste The tank drawings show 6" overflow pipes for the 126k and the 75k tanks. The inlets on these tanks are 12". AWWA requires that the overflow pipes have a capacity at least equal to the inlet rate. Please verify if a 6" overflow is appropriate for the inlet rate, or if a 12" overflow would be required.
D&R Tank Company Dave DeCoste Is there a Geotechnical Report for this project? If so, please provide.
D&R Tank Company Dave DeCoste Is there any existing lead paint in the existing tanks that need to be demolished?

Contact Information

Ph: 325-695-1070

Address: 3465 Curry Lane, Abilene, TX 79606, USA

Opening Hours:

Mon - Thurs: 7:30 AM – 5:30 PM

Fri: 8:00 AM – 12:00 PM

0