TWDB No. 62906 / JM No. 21251
City of Comanche – AMR Meter Replacement
Project Description
Note to Prime Contractors: When working with subcontractors and suppliers by email, please include this document in order to meet TWDB solicitation requirements. You may forward this as an email attachment to satisfy that requirement. Please also ask all your potential subcontractors and suppliers to download the free PDF from our website: www.jacobmartin.com. It is imperative that this language is shared with all parties involved in order for bidders to be approved for contract award. Provide proof that this was shared and keep the TWDB-0216 form updated while reaching out to interested parties.
An alternative method of direct solicitation is required if subcontractors and suppliers are not directed to (and download from) our website. If you post on your own company website or in a newspaper, or contact by phone, you must provide proof that the language included in the document below has been published and/or shared with the subcontractors and suppliers. Please see the TWDB-0210 guidance document included with the bid set for further information.
PROJECT INCLUDES: Replacement of the City’s existing water metering system with new AMI automatic read metering system.
ESTIMATED COST: Base Bid = $1,050,000
Alternate Bid = $250,000
BID BOND: 5 %
PERFORMANCE/PAYMENT BONDS: 100 %
FUNDING AGENCY: Texas Water Development Board (TWDB) / TWDB No. 62906
Contractors: Please note that we have a new feature on our website. Questions should now be entered online, in the box provided for each project prior to the question deadline. To avoid duplicating questions, please review the previously submitted questions posted at the bottom of each project’s web page.
Questions will be automatically directed to and reviewed by the project manager. All project specific questions posted here will be answered via addendum and distributed to all plan holders. Addenda will also be posted to the website and may be accessed by clicking the red “Addendums” button.
Copies of the CONTRACT DOCUMENTS must be ordered online at www.jacobmartin.com. Orders for CONTRACT DOCUMENTS may include hard copies for pick up, mail out or digital download via www.jacobmartin.com. Upon verification of online payment, hard copies may be picked up at Jacob & Martin, LLC., located at 3465 Curry Lane, Abilene, TX 79606. Cost for hard copies of the CONTRACT DOCUMENTS will be $100.00. Cost for digital download of CONTRACT DOCUMENTS will be $0.00. Contractors must purchase a set of CONTRACT DOCUMENTS to be considered a registered plan holder eligible to bid the project.
This contract is contingent upon release of funds from the Texas Water Development Board (TWDB). Any contract(s) awarded under this Invitation for Bid (IFB), Request for Proposals (RFP), or Request for Qualifications (RFQ) is/are expected to be funded in part by financial assistance from the TWDB. Neither the U.S. Environmental Protection Agency (EPA) or the State of Texas, nor any of its departments, agencies, or employees, are or will be a party to this IFB, RFP, RFQ, or any resulting contract.
The Owner reserves the right to waive any informalities and to reject any or all bids.
Any contract(s) awarded under this Invitation for Bids is/are subject to the American Iron and Steel (AIS) requirements of federal law, including federal appropriation acts and Section 1452 (a)(4) of the Safe Drinking Water Act (42 U.S.C. §300j-12(a)(4), as applicable.
For SRF Equivalency projects approved under the 2022 IUP or earlier –Any contract(s) awarded under this Invitation for Bids is/are subject to the American Iron and Steel (AIS) requirements of federal law, including federal appropriation acts and/or Section 608 of the Federal Water Pollution Control Act.
The City of Comanche is an affirmative action/equal opportunity employer. All qualified applicants will receive consideration for employment without regard to race, color, sex, age, handicap or national origin. Small and minority firms are encouraged to submit bids for this project.
Equal Opportunity in Employment - All qualified Applicants will receive consideration for employment without regard to race, color, religion, sex (including pregnancy), sexual orientation, gender identity, national origin, age (40 or older), disability, or genetic information. Bidders on this work will be required to comply with the Department of Labor regulations at 41 CFR Part 33 in the award and administration of contracts awarded under TWDB financial assistance agreements. Failure by the Contractor to carry out these requirements is a material breach, which may result in the termination of the awarded financial assistance.
Davis-Bacon prevailing wage requirements apply to the construction, alteration or repair of treatment works carried out, in whole or in part, with assistance made available by the Clean or Drinking Water State Revolving Fund (CWSRF or DWSRF). DOL wage determinations may be obtained online at http://www.wdol.gov/. For additional information on Davis-Bacon Wage Rate Requirements and its applicability to this contract, please consult TWDB Guidance No. DB-0156.
This contract is subject to the Environmental Protection Agency's (EPA) Disadvantaged Business Enterprise (DBE) Program, which includes EPA-approved fair share goals toward procurement of Minority and Women-owned Business Enterprise (M/WBE) businesses. EPA rules require that applicants and prime contractors make a good faith effort to award a fair share of contracts, subcontracts, and procurements to M/WBEs through demonstration of the six affirmative steps. For more details on the DBE Program and the current, applicable fair share goals, please visit www.twdb.texas.gov/dbe.
Project Details
- Project No: TWDB No. 62906 / JM No. 21251
- Owner: City of Comanche
- JM Office: Abilene
- Project Manager: Luke Van Diest, P.E. / lvandiest@jacobmartin.com
- Admin Contact: Abigayle VanCleave / avancleave@jacobmartin.com
- Phone: (325) 695-1070
- Prebid: No Prebid
- Prebid Date: N/A
- Bid Open Date: December 17, 2024 at 11:00 AM at Comanche City Hall, 101 East Grand, Comanche, TX 76442
Planholders List
First Name | Last Name | Company | Phone | Contractor Role | |
---|---|---|---|---|---|
Brent | Behler | Dirty Work Construction | Dirtywork4us@yahoo.com | (325) 998-3096 | General Contractor |
Don | Shuler | Professional Meters, Inc. | prosales@prometers.com | 260-633-1400 | General Contractor |
Taylor | Little | Dorado Construction Group | taylor.little@doradoconstructiongroup.com | (325) 656-5242 | General Contractor |
Hannah | Bowden | Precision & Co. Contractors LLC | Hjbowden20@gmail.com | 2546524477 | General Contractor |
Michelle | Oryl | MetronFarnier | michelle.oryl@metronfarnier.com | 2158330890 | Supplier |
Michelle | Oryl | MetronFarnier | michelle.oryl@metronfarnier.com | 2158330890 | Supplier |
LUPE | MORENO | 4M Land clearing & Excavation | landservices4m@yahoo.com | 3253301706 | General Contractor |
Kanyon | Payne | Yearout Energy Services Company LLC - Rockwall, TX | kanyon.payne@yearoutenergy.com | 18179644254 | General Contractor |
Haden | Johnson | Atlas Utility Supply | hadenjohnson@atlasutility.com | 817-733-750 | Supplier |
DANIEL | PRINZ | APSCO SUPPLY INC | DANIEL@APSCOTX.COM | 4695950243 | Supplier |
Steven | Montgomery | HydroPro Solutions | steven@hydroprosolutions.com | (940) 447-2323 | General Contractor |
Cade | Schaffner | Core and Main | cade.schaffner@coreandmain.com | (325) 650-3852 | Supplier |
Robert | Bates | Vanguard Utility Services Inc | sales@vusinc.com | (270) 926-4646 | General Contractor |
shellie | rabroker | Core & Main | shellie.rabroker@coreandmain.com | (254) 654-6482 | General Contractor |
David | Halford | H4 Construction | courtney@h4construction.com | (254) 434-8555 | General Contractor |
RONNIE | MOORE | Premier Waterworks, Inc. | rmoore@premierww.com | 18067786960 | Supplier |
Jim | McGrath | Bronco Excavating, Inc | est@broncoex.com | 5138299880 | General Contractor |
Alan | Breese | Badger Meter Inc | abreese@badgermeter.com | 4147936601 | Supplier |
Mary | Miller | PWXPress | bids@pwxpress.com | 4086768941 | General Contractor |
Richard | Sanders | Zenner USA | bnance@zennerusa.com | (972) 386-6611 | General Contractor |
Questions
Company | Name | Question |
---|---|---|
Zenner USA | Richard Sanders | Can the City provide a List of meter location addresses in Excel format as well as a list of City owned infrastructure in Excel format? We require this information in order to conduct a thorough Propagation Analysis. |
Badger Meter Inc | Alan Breese | Please clarify the meaning and intent of Addendum 1, Sec 1(b)(i), which states "Contractor may utilize the Owner’s existing Master Meter brand drive-by system hardware and software as the required drive-by backup system." |
Zenner USA | Richard Sanders | In the RFP there is a line item for meter replacement and there are lines for the box replacement we do not see a line item for meter stop replacement. Per the attached drawing “Service Water Meter Detail” it calls out a “re-pluming cost in case the meter stop is inoperable” Does the City want to add a line for the Meter Stop Replacement or just include an estimate in case it is needed. Please note that meter stop replacement can vary due to the condition of the pipe and may have to include ancillary labor |
Professional Meters, Inc. | Don Shuler | Please check the E-address for Professional Meters; prosales@prometers.com is correct. |
Badger Meter Inc | Alan Breese | When will the Excel list of addresses be made available to all respondents? This is needed for an RF estimate to ensure coverage. |
Contact Information
Ph: 325-695-1070
Address: 3465 Curry Lane, Abilene, TX 79606, USA
Opening Hours:
Mon - Thurs: 7:30 AM – 5:30 PM
Fri: 8:00 AM – 12:00 PM