JM No. 25361
City of Colorado City – Northeast Well Field Development – Wells & Water Line
Project Description
PROJECT INCLUDES:
Wells - base bid includes construction of 1 new drinking water well to TCEQ standards (drilling well, casing, pump, concrete seal block, piping, valves, & electrical). Alternate bids will be taken for 2 additional wells.
Waterline - base bid includes approximately 4900 LF of 12" through 6" C900 PVC water line, connections, bore and encasement, and incidentals. Alternate bids will be taken for additional water line.
ESTIMATED COST:
Well Contract = $248,000
Alternate #1 and #2 for the wells are $248,000 each
Waterline Contract = $532,000
Alternate #1 and #2 for the waterline will be $136,000 and $133,000.
BID BOND: 100%
PERFORMANCE/PAYMENT BOND: 100%
FUNDING AGENCY: Local Funds
Contractors: Please note that we have a new feature on our website. Questions should now be entered online, in the box provided for each project prior to the question deadline. To avoid duplicating questions, please review the previously submitted questions posted at the bottom of each project’s web page.
Questions will be automatically directed to and reviewed by the project manager. All project specific questions posted here will be answered via addendum and distributed to all plan holders. Addenda will also be posted to the website and may be accessed by clicking the red “Addendums” button.
Copies of the CONTRACT DOCUMENTS must be ordered online at www.jacobmartin.com. Orders for CONTRACT DOCUMENTS may include hard copies for pick up, mail out or digital download via www.jacobmartin.com. Upon verification of online payment, hard copies may be picked up at Jacob & Martin, LLC., located at 3465 Curry Lane, Abilene, TX 79606. Cost for hard copies of the CONTRACT DOCUMENTS will be $100.00. Cost for digital download of CONTRACT DOCUMENTS will be $0.00. Contractors must purchase a set of CONTRACT DOCUMENTS to be considered a registered plan holder eligible to bid the project.
Project Details
- Project No: JM No. 25361
- Owner: City of Colorado City
- JM Office: Abilene
- Project Manager: Luke Van Diest, P.E. / lvandiest@jacobmartin.com
- Admin Contact: Katy Stryker / kstryker@jacobmartin.com
- Phone: (325) 695-1070
- Prebid: No Prebid
- Prebid Date: N/A
- Bid Open Date: October 14, 2026 at 10:00 AM at City Hall, 180 W. 3rd Street, Colorado City, TX 79512
Planholders List
| First Name | Last Name | Company | Phone | Contractor Role | |
|---|---|---|---|---|---|
| James | Martinez | JAMCO Drilling | jamcodrilling@gmail.com | 2147013888 | Sub Contractor |
| Kay | Keene | Whitewater Construction, Inc. | kkwhitewater1997@gmail.com | 2548635750 | General Contractor |
| Randall | Whitney | Whitney Underground Utilities | randall.whitco@gmail.com | 2544052965 | General Contractor |
| Kasyn | Herman | GAGE AND CADE CONSTRUCTION | kasyn@gageandcadeconstruction.com | 5128767183 | General Contractor |
| Cody | Looka | Trifecta Equipment Contracting | Cody@TrifectaEC.com | 3254500237 | General Contractor |
| Guyman | Richards | Larry Baxter Construction, LLC | office@larrybaxter.com | (325) 650-3330 | General Contractor |
| Guyman | Richards | Larry Baxter Construction, LLC | baxterconstructionllc@yahoo.com | (325) 650-3330 | General Contractor |
| Russell | Southerland | West Texas Water Well Services | russell@wtwws.com | 4325563292 | General Contractor |
| Allison | Trevino | Core and Main | allison.trevino@coreandmain.com | 8062839220 | Supplier |
| Milica | Yurong | Dodge Data & Analytics | milica.yurong@construction.com | 8443283826 | Plan Room |
| Stephanie | Lister | Mike's Drilling, LLC | bids@mikesdrillingaz.com | 5203992781 | General Contractor |
| El | Estrabela | ConstructConnect | El.Estrabela@constructconnect.com | 2402219248 | General Contractor |
| Jeremy | Finley | Finco Services | jeremy@fincoservicestx.com | 2546317165 | General Contractor |
| JASON | BEHLER | J-Co | jbehler.jco@gmail.com | (325) 998-4283 | General Contractor |
| Will | Phillips | Cornerstone Civil | wphillips@cornerstoneciviltx.com | 9792199893 | General Contractor |
| James | Martinez | JAMCO Drilling | jamcodrilling@gmail.com | 2147013888 | Sub Contractor |
| John | Baker | LarMar Industries | jbaker@larmarindustries.com | 4323128143 | Supplier |
| Bucky | McDaniel | APSCO Supply | bucky@apscotx.com | 13259981055 | Supplier |
| Mary | Miller | PWXPress | bids@pwxpress.com | (408) 676-8941 | Plan Room |
| Camron | Fambro | Fambro Construction, LLC | camronfambro@fambroconstruction.com | 2544851169 | General Contractor |
| Connor | Hoelscher | Texas Water and Soil Company, Inc. | connor@texaswaterandsoil.com | 3256569813 | General Contractor |
| JD | Verfurth | Verfurth Electric | VerfurthElectric@Outlook.com | 3256035336 | Sub Contractor |
| Sarah | Kelly | Amtek USA | amtek.austin@amtekusa.com | (281) 376-4577 | Plan Room |
| Sarah | Kelly | Amtek USA | amtek.austin@amtekusa.com | (281) 376-4577 | Plan Room |
| CODY | HAMBLIN | Leonard Water Services | colin@leonardwaterservices.com | 3256691903 | General Contractor |
| Gerald | Downing | Dowtech Specialty Contractors, Inc. | dowtech@dowtechspecialty.com | (325) 893-4684 | General Contractor |
| CODY | HAMBLIN | Leonard Water Services | colin@leonardwaterservices.com | 3256691903 | General Contractor |
| Tiffanie | Melone | Darnell Construction, LLC | tmm.ddarnell@suddenlinkmail.com | (325) 653-1920 | General Contractor |
| Amy | Majors | Hydro Resources - Mid Continent, Inc. | AMajors@HydroResources.com | (800) 401-9092 | General Contractor |
| Delwin | Clevenger | Clevenger Water Well Services | tcwwservices@gmail.com | 4322122775 | General Contractor |
| Mike | Neill | JCH, Inc. | mike.neill@jchinc.com | 8063365913 | Supplier |
| William | Barnett | Benmark Supply | williambarnett@benmark.com | 3256929889 | Supplier |
Questions
| Company | Name | Question |
|---|---|---|
| Texas Water and Soil Company, Inc. | Connor Hoelscher | Can we get some clarity for the new water wells? Can we get some clarity on these items? 1. Open hole logs (usually requested) 2. Caliper log (Usually required for PWS/TCEQ) 3. 6 inch casing is definitely not recommended (8" is best) 4. Recommend a 2" gravel feed tube I would push back on these items 1. Hole size: 14.75", not 12" 2. Use less screened pipe (start below the static water level and if thats not possible less screen is still recomended. They have a lot of iron bacteria issues from exposed screens in the area already) 3. Bring gravel 10' above the top of the screens, preferably 20' above 4. Sieve analysis for gravel and screen size selection 5. Pump gravel into place not free fall into place |