ABILENE NO. CB-2639 / JM NO. 23461

City of Abilene – First Pressure Plane – 2.0 MG Elevated Storage Tank

Project Description

 

A mandatory Pre-Bid Conference will be held in the Water Utilities Conference Room on the 1st floor of City Hall, 555 Walnut St., Abilene TX 79601 at 10:00 AM on September 8, 2026, to discuss the scope of the project and answer any questions prospective bidders may have concerning specifics of the project. The Contractor or their designated representative may attend.

PROJECT INCLUDES:             This project includes the construction of a 2.0 million gallon (MG) composite elevated storage tank, site work, electrical, yard piping, SWPPP, and incidentals.

ESTIMATED COST:                $9,000,000

BID BOND:                             No bid bond required.

PERFORMANCE/PAYMENT BOND: 100%

FUNDING AGENCY:              City of Abilene / Abilene Contract No. CB- 2639

Contractors: Please note that we have a new feature on our website. Questions should now be entered online, in the box provided for each project prior to the question deadline. To avoid duplicating questions, please review the previously submitted questions posted at the bottom of each project’s web page.

Questions will be automatically directed to and reviewed by the project manager. All project specific questions posted here will be answered via addendum and distributed to all plan holders. Addenda will also be posted to the website and may be accessed by clicking the red “Addendums” button.

Copies of the CONTRACT DOCUMENTS must be ordered online at www.jacobmartin.com.  Orders for CONTRACT DOCUMENTS may include hard copies for pick up, mail out or digital download via www.jacobmartin.com.  Upon verification of online payment, hard copies may be picked up at Jacob & Martin, LLC., located at 3465 Curry Lane, Abilene, TX 79606.  Cost for hard copies of the CONTRACT DOCUMENTS will be $100.00.  Cost for digital download of CONTRACT DOCUMENTS will be $0.00.  Contractors must purchase a set of CONTRACT DOCUMENTS to be considered a registered plan holder eligible to bid the project.

Project Details

  • Project No: ABILENE NO. CB-2639 / JM NO. 23461
  • Owner: City of Abilene
  • JM Office: Abilene
  • Project Manager: Kirt Harle, P.E. / kirth@jacobmartin.com
  • Admin Contact: Katy Stryker / kstryker@jacobmartin.com
  • Phone: (325) 695-1070
  • Prebid: Mandatory
  • Prebid Date: September 8, 2026 at 10:00 AM in the Water Utilities Conference Room on the 1st floor of City Hall, 555 Walnut St., Abilene TX 79601
  • Bid Open Date: September 15, 2026 at 2:00 PM at Received by the City of Abilene Purchasing Department and then publicly opened and read aloud in the Council Chambers – Abilene City Hall, 555 Walnut, Abilene, Texas

Select Plan Type:

Planholders List

First Name Last Name Company Email Phone Contractor Role
DaynanColemanTitan Environmental USAd.coleman@titanenviro.com3465878621Sub Contractor
KyleNelsonRangelinekyle@rangeline.com8172398536Sub Contractor
LaneSalvatoThe Barry Group, LLC Independent Representative of Tnemec Company, Inc.lsalvato@barrygroupllc.com(972) 312-8448Supplier
TreyBauchmanGrimsley Electric, Inc.trey@grimsleyelectric.com(325) 641-0564Sub Contractor
CassidyBuchanan1836 Construction1836constructionbidding@gmail.com9407815584Sub Contractor
ElEstrabelaConstructConnectEl.Estrabela@constructconnect.com2402219248General Contractor
MichaelCarpenterEnvironmental Improvements, Inc.mledger@ei2water.com9724362536Supplier
WilliamBarnettBenmark Supplywilliambarnett@benmark.com3256929889Supplier
MaryMillerPWXPressbids@pwxpress.com(408) 676-8941Plan Room
LaneSalvatoThe Barry Group, LLC Independent Representative of Tnemec Company, Inc.lsalvato@barrygroupllc.com(972) 312-8448Supplier
ConnorHoelscherTexas Water and Soil Company, Inc.connor@texaswaterandsoil.com3256569813General Contractor
BillyWalkerPermian Energy Servicesbwalker@permian-es.com(325) 352-7374Sub Contractor
EmilioDiazBig Country Construction Services, LLCdiaz.darnell@gmail.com(972) 433-2381Sub Contractor
LaneSalvatoThe Barry Group, LLC Independent Representative of Tnemec Company, Inc.lsalvato@barrygroupllc.com(972) 312-8448Supplier
RichardWillisGraybar Electric Companyrichard.willis@graybar.com3257942117Supplier
BrittanySimmonsPrecision Pump Systemsbsimmons@zoneindustries.com8179125151Supplier
JakeHaydenHaydenshandley@planhub.com6038542054Plan Room
JadeColemanCB&I Storage Tank Solutions, LLCjade.coleman@cbi.com(346) 417-5232General Contractor
SarahKellyAmtek USAamtek.austin@amtekusa.com2813764577Plan Room
VenkateshSivaBlackridge Research & Consultingvenkatesh@blackridgeresearch.com(917) 993-7467Plan Room
DylanMcGlothlinETSprinklersetsprinklers@gmail.com7015807790Plan Room
ClintCarlileCarlile Specialty Contractors, LLCkathy@dowtechspecialty.com(325) 370-1561General Contractor
GeraldDowningDowtech Specialty Contractors, Inc.dowtech@dowtechspecialty.com(325) 893-4684General Contractor
ClaytonWiatrekPhoenix Fabricators & Erectors, LLCclayton.wiatrek@phoenixtank.com(830) 534-5468General Contractor
JessicaBradburyPhoenix Fabricators and Erectors, LLCjessica.bradbury@phoenixtank.com(317) 737-2936General Contractor
TeamLandmarkLandmark Structures I, L.P.estimating@teamlandmark.com8174398888General Contractor
CarolynBurkeCaldwell Tanks, Inc.cburke@caldwelltanks.com(502) 964-3361General Contractor

Questions

Company Name Question
Big Country Construction Services LLC Emilio Diaz Please confirm the erosion-control and SWPPP scope intended for subcontractor pricing, including the applicable drawing sheets, specification sections and bid-schedule items. Please also clarify whether erosion-control quantities will be provided by the Engineer or must be developed by the bidder, and identify who is responsible for SWPPP inspections, maintenance, replacement, documentation and final removal throughout construction.
CB&I Storage Tank Solutions, LLC Jade Coleman Request for a one or two week bid date extension beyond September 15th.
CB&I Storage Tank Solutions, LLC Jade Coleman Please confirm that CB&I standard geometry and roof style is acceptable.
CB&I Storage Tank Solutions, LLC Jade Coleman Can the maximum form height be increased to 12 feet, as this is our standard?
CB&I Storage Tank Solutions, LLC Jade Coleman What building or construction permits will the Contractor need to obtain for this project?  Will a Building Permit and/or Plan Review be required from the city or county? If so, whom do we contact to determine what is the cost?  Are there any other licenses or fees that the Contractor must pay for? Will the cost of the Building Permit be waived since it is a municipal project?
CB&I Storage Tank Solutions, LLC Jade Coleman How is this project being funded?
CB&I Storage Tank Solutions, LLC Jade Coleman Is this project exempt from state and local taxes?
CB&I Storage Tank Solutions, LLC Jade Coleman Is there any 3rd party inspection (i.e., TIC, KLM, AEC, etc.) on engineering construction or painting? If so, who will it be and on what portion of work?
CB&I Storage Tank Solutions, LLC Jade Coleman Drawing Sheet 07 shows a cone roof on the tank. Please confirm that a dome roof can be provided.
CB&I Storage Tank Solutions, LLC Jade Coleman Specification 13 07 03, Page 12, Part 3.2.A.6 states that concrete pour heights are limited to a maximum of 10 feet. Please confirm that the use of 12 foot pour heights is acceptable.
CB&I Storage Tank Solutions, LLC Jade Coleman Drawings sheet 7 states that landings should be spaced at 25' MAX while section 13 07 03 2.6 D calls out a maximum of 30' intervals. Please confirm which is correct.
CB&I Storage Tank Solutions, LLC Jade Coleman Drawings sheet 7 states that landings should be spaced at 25' MAX while section 13 07 03 2.6 D calls out a maximum of 30' intervals. Please confirm which is correct.
CB&I Storage Tank Solutions, LLC Jade Coleman Section 130703 states to size venting based on current inlet/outlet piping but with the addition of the 20" capped off penetration into the tank for future riser addition, it would alter the venting required. Please confirm that our bids should only include for venting based on the current single 20" riser configuration.
CB&I Storage Tank Solutions, LLC Jade Coleman General Conditions 13.2 states that the contractor must employ and maintain on the work a qualified supervisor or superintendent. Please confirm that this supervisor does not need to be a direct hire of the contractor but shall assign a competent resident superintendent who will not be replaced without written notice

Contact Information

Ph: 325-695-1070

Address: 3465 Curry Lane, Abilene, TX 79606, USA

Opening Hours:

Mon - Thurs: 7:30 AM – 5:30 PM

Fri: 8:00 AM – 12:00 PM

0