ABILENE NO. CB-2639 / JM NO. 23461
City of Abilene – First Pressure Plane – 2.0 MG Elevated Storage Tank
Project Description
A mandatory Pre-Bid Conference will be held in the Water Utilities Conference Room on the 1st floor of City Hall, 555 Walnut St., Abilene TX 79601 at 10:00 AM on September 8, 2026, to discuss the scope of the project and answer any questions prospective bidders may have concerning specifics of the project. The Contractor or their designated representative may attend.
PROJECT INCLUDES: This project includes the construction of a 2.0 million gallon (MG) composite elevated storage tank, site work, electrical, yard piping, SWPPP, and incidentals.
ESTIMATED COST: $9,000,000
BID BOND: No bid bond required.
PERFORMANCE/PAYMENT BOND: 100%
FUNDING AGENCY: City of Abilene / Abilene Contract No. CB- 2639
Contractors: Please note that we have a new feature on our website. Questions should now be entered online, in the box provided for each project prior to the question deadline. To avoid duplicating questions, please review the previously submitted questions posted at the bottom of each project’s web page.
Questions will be automatically directed to and reviewed by the project manager. All project specific questions posted here will be answered via addendum and distributed to all plan holders. Addenda will also be posted to the website and may be accessed by clicking the red “Addendums” button.
Copies of the CONTRACT DOCUMENTS must be ordered online at www.jacobmartin.com. Orders for CONTRACT DOCUMENTS may include hard copies for pick up, mail out or digital download via www.jacobmartin.com. Upon verification of online payment, hard copies may be picked up at Jacob & Martin, LLC., located at 3465 Curry Lane, Abilene, TX 79606. Cost for hard copies of the CONTRACT DOCUMENTS will be $100.00. Cost for digital download of CONTRACT DOCUMENTS will be $0.00. Contractors must purchase a set of CONTRACT DOCUMENTS to be considered a registered plan holder eligible to bid the project.
Project Details
- Project No: ABILENE NO. CB-2639 / JM NO. 23461
- Owner: City of Abilene
- JM Office: Abilene
- Project Manager: Kirt Harle, P.E. / kirth@jacobmartin.com
- Admin Contact: Katy Stryker / kstryker@jacobmartin.com
- Phone: (325) 695-1070
- Prebid: Mandatory
- Prebid Date: September 8, 2026 at 10:00 AM in the Water Utilities Conference Room on the 1st floor of City Hall, 555 Walnut St., Abilene TX 79601
- Bid Open Date: September 15, 2026 at 2:00 PM at Received by the City of Abilene Purchasing Department and then publicly opened and read aloud in the Council Chambers – Abilene City Hall, 555 Walnut, Abilene, Texas
Planholders List
| First Name | Last Name | Company | Phone | Contractor Role | |
|---|---|---|---|---|---|
| Daynan | Coleman | Titan Environmental USA | d.coleman@titanenviro.com | 3465878621 | Sub Contractor |
| Kyle | Nelson | Rangeline | kyle@rangeline.com | 8172398536 | Sub Contractor |
| Lane | Salvato | The Barry Group, LLC Independent Representative of Tnemec Company, Inc. | lsalvato@barrygroupllc.com | (972) 312-8448 | Supplier |
| Trey | Bauchman | Grimsley Electric, Inc. | trey@grimsleyelectric.com | (325) 641-0564 | Sub Contractor |
| Cassidy | Buchanan | 1836 Construction | 1836constructionbidding@gmail.com | 9407815584 | Sub Contractor |
| El | Estrabela | ConstructConnect | El.Estrabela@constructconnect.com | 2402219248 | General Contractor |
| Michael | Carpenter | Environmental Improvements, Inc. | mledger@ei2water.com | 9724362536 | Supplier |
| William | Barnett | Benmark Supply | williambarnett@benmark.com | 3256929889 | Supplier |
| Mary | Miller | PWXPress | bids@pwxpress.com | (408) 676-8941 | Plan Room |
| Lane | Salvato | The Barry Group, LLC Independent Representative of Tnemec Company, Inc. | lsalvato@barrygroupllc.com | (972) 312-8448 | Supplier |
| Connor | Hoelscher | Texas Water and Soil Company, Inc. | connor@texaswaterandsoil.com | 3256569813 | General Contractor |
| Billy | Walker | Permian Energy Services | bwalker@permian-es.com | (325) 352-7374 | Sub Contractor |
| Emilio | Diaz | Big Country Construction Services, LLC | diaz.darnell@gmail.com | (972) 433-2381 | Sub Contractor |
| Lane | Salvato | The Barry Group, LLC Independent Representative of Tnemec Company, Inc. | lsalvato@barrygroupllc.com | (972) 312-8448 | Supplier |
| Richard | Willis | Graybar Electric Company | richard.willis@graybar.com | 3257942117 | Supplier |
| Brittany | Simmons | Precision Pump Systems | bsimmons@zoneindustries.com | 8179125151 | Supplier |
| Jake | Hayden | Hayden | shandley@planhub.com | 6038542054 | Plan Room |
| Jade | Coleman | CB&I Storage Tank Solutions, LLC | jade.coleman@cbi.com | (346) 417-5232 | General Contractor |
| Sarah | Kelly | Amtek USA | amtek.austin@amtekusa.com | 2813764577 | Plan Room |
| Venkatesh | Siva | Blackridge Research & Consulting | venkatesh@blackridgeresearch.com | (917) 993-7467 | Plan Room |
| Dylan | McGlothlin | ETSprinklers | etsprinklers@gmail.com | 7015807790 | Plan Room |
| Clint | Carlile | Carlile Specialty Contractors, LLC | kathy@dowtechspecialty.com | (325) 370-1561 | General Contractor |
| Gerald | Downing | Dowtech Specialty Contractors, Inc. | dowtech@dowtechspecialty.com | (325) 893-4684 | General Contractor |
| Clayton | Wiatrek | Phoenix Fabricators & Erectors, LLC | clayton.wiatrek@phoenixtank.com | (830) 534-5468 | General Contractor |
| Jessica | Bradbury | Phoenix Fabricators and Erectors, LLC | jessica.bradbury@phoenixtank.com | (317) 737-2936 | General Contractor |
| Team | Landmark | Landmark Structures I, L.P. | estimating@teamlandmark.com | 8174398888 | General Contractor |
| Carolyn | Burke | Caldwell Tanks, Inc. | cburke@caldwelltanks.com | (502) 964-3361 | General Contractor |
Questions
| Company | Name | Question |
|---|---|---|
| Big Country Construction Services LLC | Emilio Diaz | Please confirm the erosion-control and SWPPP scope intended for subcontractor pricing, including the applicable drawing sheets, specification sections and bid-schedule items. Please also clarify whether erosion-control quantities will be provided by the Engineer or must be developed by the bidder, and identify who is responsible for SWPPP inspections, maintenance, replacement, documentation and final removal throughout construction. |
| CB&I Storage Tank Solutions, LLC | Jade Coleman | Request for a one or two week bid date extension beyond September 15th. |
| CB&I Storage Tank Solutions, LLC | Jade Coleman | Please confirm that CB&I standard geometry and roof style is acceptable. |
| CB&I Storage Tank Solutions, LLC | Jade Coleman | Can the maximum form height be increased to 12 feet, as this is our standard? |
| CB&I Storage Tank Solutions, LLC | Jade Coleman | What building or construction permits will the Contractor need to obtain for this project? Will a Building Permit and/or Plan Review be required from the city or county? If so, whom do we contact to determine what is the cost? Are there any other licenses or fees that the Contractor must pay for? Will the cost of the Building Permit be waived since it is a municipal project? |
| CB&I Storage Tank Solutions, LLC | Jade Coleman | How is this project being funded? |
| CB&I Storage Tank Solutions, LLC | Jade Coleman | Is this project exempt from state and local taxes? |
| CB&I Storage Tank Solutions, LLC | Jade Coleman | Is there any 3rd party inspection (i.e., TIC, KLM, AEC, etc.) on engineering construction or painting? If so, who will it be and on what portion of work? |
| CB&I Storage Tank Solutions, LLC | Jade Coleman | Drawing Sheet 07 shows a cone roof on the tank. Please confirm that a dome roof can be provided. |
| CB&I Storage Tank Solutions, LLC | Jade Coleman | Specification 13 07 03, Page 12, Part 3.2.A.6 states that concrete pour heights are limited to a maximum of 10 feet. Please confirm that the use of 12 foot pour heights is acceptable. |
| CB&I Storage Tank Solutions, LLC | Jade Coleman | Drawings sheet 7 states that landings should be spaced at 25' MAX while section 13 07 03 2.6 D calls out a maximum of 30' intervals. Please confirm which is correct. |
| CB&I Storage Tank Solutions, LLC | Jade Coleman | Drawings sheet 7 states that landings should be spaced at 25' MAX while section 13 07 03 2.6 D calls out a maximum of 30' intervals. Please confirm which is correct. |
| CB&I Storage Tank Solutions, LLC | Jade Coleman | Section 130703 states to size venting based on current inlet/outlet piping but with the addition of the 20" capped off penetration into the tank for future riser addition, it would alter the venting required. Please confirm that our bids should only include for venting based on the current single 20" riser configuration. |
| CB&I Storage Tank Solutions, LLC | Jade Coleman | General Conditions 13.2 states that the contractor must employ and maintain on the work a qualified supervisor or superintendent. Please confirm that this supervisor does not need to be a direct hire of the contractor but shall assign a competent resident superintendent who will not be replaced without written notice |